Monday, December 9, 2019
Safety and Risk Management Of Granville Rail â⬠MyAssignmenthelp.com
Question: Discuss about the Safety and Risk Management Of Granville Rail. Answer: Introduction The incident is related to Granville rail disaster that occurred in 1977, which is at the western suburb of Sydney Australia, when there was a crowded commuter train which derailed mainly running into the support of the bridge on the road. The train collapsed and the people died, as a result of this. The crowded carrier with the hauling by New South Wales include how the support of the overhead is constructed of the steel and concrete. There is a derailed engine with the passage that includes the bridging where the first carriage broke free from the other carriage. (Baysari et al., 2008). There has been constant travelling of the passengers and half of them were dead. The rescuers also faced the difficulty in handling the bridge weight as it was crushing that affected the carriage with the reduced spacing to work for the survivors to get out. The other damage came from the gas cylinders. The leakage of the gas was under the use of the powered rescue tools. The NSW Fire Brigade also p rovided with the ventilation to dispel the gas and then the constant film of water. Incident for the train crashes in Australia as a result of safety breaches There have been issues related to the safety breach which include the dedicated improvement of the rail safety and then campaigning for the establishment with the independent forms of the railway safety ombudsman.(Reason, 2016). There are different factors which led to the breach of the security policy: The driver who was on duty at that time is the primary cause with the worn wheel on the worn rail. The locomotives could simply climb out, where speed was not a significant factor. The attempt to cover and handle the tracking of the maintenance group is mainly to measure the tracking of the gauge in points. The high death toll leads to the concrete deck of the Bold street bridge that tends to collapse on the train. One of the inadequacies of the bridge designing was made public as well after the smash. The Wran government has been elected for handling themismanagement and then underspending any of the corrupt Askin Lewis. The appointments have been a total cut cost, where there are no major differences to the losses and the speed of maintenance is considered to be the primary concern of the Granville smash. The net result of the cuts to the rail led to some of the unending road deaths which was caused by the trucks. (Salmon et al., 2012).The external costs in the soaring road are found to be spending and paying for the truck smashes which are ignored. There are different lists of the report which relate to the maintenance problems and how the network needs to maintain the reliability with the cleanliness and safety. The inadequacy of the tracking of the inspection and the maintenance is also about being systematic. Detail any changes to policy or practice that resulted from the incident and how this was implemented. With this, there was a complete rebuilt of the structure with the single span that is without any of the intermediate supporting pier. With this, the bridges were also constructed similar to the destroyed bridge that has the reinforcement. The major focus of the incident is the cause of the crash that was mainly due to the unsatisfactory conditions, which leads to the poor fastening of the track. It also led to the cause of the track to spread and then allow the left front wheel of the locomotive to come off the rail. (Baysari et al., 2009).The related higher turnover is combined with the lack of the standardised procedures for properly tracking the inspections. Hence, for this, the check is also on the limits of how the inspection and the maintenance has been occurring. There are other factors which include the structure of the bridge which has been built. With this, there is another function where the concrete is set with the other factors. This includes the structure of the bridge and when it is set at the lower parameter than the road. There are other additional weights which are added to the destruction of the wooden train carriage, where the disaster is mainly due to the substantial increase in the maintenance of the rail expenditure. The train driver is expected to set the proper establishment with the commemorate of the victims and the campaigning of proper improvement of the safety of the rail. For handling the issues, it has been seen that there are establishment of the safety improvement campaigns. The focus of the Trust has been for the handling of the tracks with the number of the passengers who were killed. (Salmon et al., 2012). With this, the trust is also about making the submissions on the safety issues which include the fines related to the safety breach which include the establishment of the better documentary to explain how to handle the situations. For the safety breach, there have been no major significance of the risks related to the derailment with the excursion that relates to the posted limits. The engineering practices for the long-term reasons are related to limit all the heavy trains to lower their speed limits. To properly maintain the standards, there are some of the obsolescent patterns which are then compared with the use of the equipment and working on the facilities like the lighting, riding quality and handling the suppression of noise. The heati ng and the cooling systems with the political agitation is set at the time of upgradation which is mainly about comfort than safety. The carriages are on the wood of the steel underframes with the practical matters where the vehicle travelling is set at the speed to hit the stanchions with the solid concrete structure. Some of the recommended changes for handling the issues in the later part are to track all the unfit tracks with the suggestion of the substantial tolerances where there is a need to build in or else there is a possibility of placing the restrictions. (Dorrain et al., 2011). No political issues were the lack of the maintenance or the upgrades. This was mainly due to the cowardly act where there were senior bureaucrats who were bullying the politicians and then other unsophisticated electorates. The links are related to work on the delayed effects with the parts that handle the relevant about the commuting of the long distances. Conclusion The failure of the urban planning with the cowardly senior bureaucrats, rested on the vested interests. If the speed boards are used for the calculation of the level crossing warning times, then the signals overlaps. With this, there is a possibility that a grief is there with the driver speed. The arrival is at the level with a lower boom and the overrunning of the overlaps. Here, the driver will not be requiring the speed restrictions with the imposed, curves or the turnouts which are related to the care driving over the different limits. The factors where the government is also able to handle the responsive pressures is mainly based on involving all the specific moves which are mainly to make sure of the journey patterns. The commuters travel and work on the safe operations, with the concern related to avoid any delays. References Baysari, M. T., Caponecchia, C., McIntosh, A. S., Wilson, J. R. (2009). Classification of errors contributing to rail incidents and accidents: A comparison of two human error identification techniques.Safety Science,47(7), 948-957. Baysari, M. T., McIntosh, A. S., Wilson, J. R. (2008). Understanding the human factors contribution to railway accidents and incidents in Australia.Accident Analysis Prevention,40(5), 1750-1757. Dorrian, J., Baulk, S. D., Dawson, D. (2011). Work hours, workload, sleep and fatigue in Australian Rail Industry employees.Applied ergonomics,42(2), 202-209. Reason, J. (2016). management the risks of organizational accidents. Routledge. Salmon, P. M., Cornelissen, M., Trotter, M. J. (2012). Systems-based accident analysis methods: A comparison of Accimap, HFACS, and STAMP.Safety science,50(4), 1158-1170.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.